IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 3219 Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0563 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $406 Implemented
UF0563 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,895 $3,125 Implemented
UF0563 # 05 Y:2020 05 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,582 $735 Implemented
UF0563 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $951 $0 Implemented
UF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,163 $0 Implemented
UF0563 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $24,451 $95,589 Not Implemented
MI0248 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,241 $1,660 Implemented
MI0248 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,335 $440 Not Implemented
MI0248 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,637 $9,460 Not Implemented
MI0248 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,983 $30,489 Implemented
MI0248 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,449 $2,300 Implemented
MI0248 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $605 $209 Not Implemented
MI0248 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $965 $2,200 Not Implemented
MI0248 # 07 Y:2013 07 2013 PAY BILLS ON TIME TO AVOID LATE FEES $1,005 $240 Implemented
MI0248 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,180 $80 Implemented
MI0122 # 09 Y:2006 09 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $245 $940 Not Implemented
MI0122 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $602 $940 Not Implemented
MI0122 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $260 Not Implemented
MI0122 # 06 Y:2006 06 2006 UPGRADE OBSOLETE EQUIPMENT $1,085 $28 Not Implemented
MI0122 # 05 Y:2006 05 2006 UPGRADE OBSOLETE EQUIPMENT $1,134 $28 Not Implemented
MI0122 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $1,074 Not Implemented
MI0122 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,318 $1,074 Not Implemented
MI0122 # 02 Y:2006 02 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,874 $3,709 Not Implemented
MI0122 # 01 Y:2006 01 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,965 $5,163 Not Implemented
MI0106 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,649 $12,563 Not Implemented