IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

971

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0011 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,000 $5,000 Implemented
TT0011 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,054 $559,252 Not Implemented
TT0011 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $60 Implemented
CO0602 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,270 $89,570 Not Implemented
CO0602 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $610 Implemented
CO0602 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,460 $0 Implemented
CO0602 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,220 $3,430 Not Implemented
CO0602 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $117 $276 Implemented
CO0602 # 06 Y:2007 06 2007 INCREASE EFFICIENCY OF TRUCKS $5,040 $0 Not Implemented
CO0602 # 07 Y:2007 07 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,290 $11,000 Not Implemented
CO0602 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $2,270 Not Implemented
CO0602 # 09 Y:2007 09 2007 INSTALL OCCUPANCY SENSORS $50 $200 Not Implemented
UA0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $252 Not Implemented
UA0001 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,116 $3,113 Not Implemented
UA0001 # 03 Y:2007 03 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,151 $64 Not Implemented
UA0001 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,147 $3,013 Not Implemented
UA0001 # 05 Y:2007 05 2007 UTILIZE JOB COSTING SOFTWARE $31,200 $8,489 Not Implemented
UA0001 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $564 $1,110 Not Implemented
UA0001 # 07 Y:2007 07 2007 RECOVER AND REUSE WASTE MATERIAL $6,000 $0 Not Implemented
MS0309 # 01 Y:2007 01 2007 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $399,965 $2,750,000 Not Implemented
MS0309 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,357 $7,875 Implemented
MS0309 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,962 $156 Implemented
MS0309 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,297 $2,981 Implemented
MS0309 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $3,593 Implemented
MS0308 # 01 Y:2007 01 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $8,320 $2,753 Implemented