IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0785 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $0 Implemented
OR0785 # 04 Y:2023 04 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,475 $16,140 Not Implemented
OR0785 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $4,224 $1,583 Not Implemented
OR0785 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,209,151 $28,500 Not Implemented
OR0785 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $3,141 $4,510 Not Implemented
OR0739 # 03 Y:2021 03 2021 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,419 $32,321 Not Implemented
OR0739 # 02 Y:2021 02 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,852 $1,794 Not Implemented
OR0739 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,888 $0 Implemented
OR0665 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,434 $0 Implemented
OR0665 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,140 $7,325 Not Implemented
OR0665 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,107 $1,025 Not Implemented
OR0665 # 02 Y:2016 02 2016 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $88,324 $19,650 Not Implemented
OR0665 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,044 $11,800 Implemented
OR0617 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $8,494 $35,187 Implemented
OR0617 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,848 $60,000 Implemented
OR0617 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,516 $13,850 Implemented
OR0617 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $21,219 $131,114 Implemented
OR0617 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $237,215 $2,000,000 Not Implemented
OR0617 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,455 $4,610 Implemented
OR0617 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,239 $20,000 Implemented
OR0617 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,023 $11,440 Not Implemented
OR0590 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,954 $5,038 Not Implemented
OR0590 # 02 Y:2012 02 2012 USE OPTIMUM TEMPERATURE $3,137 $0 Implemented
OR0590 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,188 $87,787 Not Implemented
OR0589 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,386 $0 Not Implemented