IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
Reset
NAICS 321911 Wood Window and Door Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0036 # 04 Y:2025 04 2025 OPTIMIZE PLANT POWER FACTOR $6,170 $16,268 n/a
NT0036 # 03 Y:2025 03 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,825 $0 n/a
NT0036 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,972 $5,609 n/a
NT0036 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $688 $0 n/a
UW2408 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $116,105 $13,500 n/a
UW2408 # 10 Y:2024 10 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,176 $144,799 n/a
UW2408 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,014 $0 n/a
UW2408 # 07 Y:2024 07 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,834 $133,560 n/a
UW2408 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $45,697 $89,919 n/a
UW2408 # 06 Y:2024 06 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $35,732 $2,619 n/a
UW2408 # 01 Y:2024 01 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,069 $103,000 n/a
UW2408 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,306 $2,080 n/a
UW2408 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $61,411 $421,830 n/a
UW2408 # 08 Y:2024 08 2024 INSULATE FEEDWATER TANK $2,901 $290 n/a
OR0785 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,209,151 $28,500 Not Implemented
OR0785 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $4,224 $1,583 Not Implemented
OR0785 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $3,141 $4,510 Not Implemented
OR0785 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $0 Implemented
OR0785 # 04 Y:2023 04 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,475 $16,140 Not Implemented
SU0543 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $853 $45 Not Implemented
SU0543 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $370 $433 Not Implemented
SU0543 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,574 $129 Not Implemented
SU0543 # 10 Y:2023 10 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $4,746 Not Implemented
SU0543 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,796 $218 Not Implemented
SU0543 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,981 $0 Not Implemented