Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
243
matching recommendationsNAICS | 321912 | Cut Stock, Resawing Lumber, and Planing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0058 # 06 Y:2015 | 06 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,480 | $750 | Not Implemented |
BS0058 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,497 | $220 | Not Implemented |
MZ0180 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $2,816 | $3,700 | Implemented |
MZ0180 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,512 | $23,625 | Implemented |
MZ0180 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,237 | $900 | Implemented |
MZ0180 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $772 | $1,500 | Not Implemented |
MZ0180 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,163 | $10,500 | Not Implemented |
MZ0180 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,380 | $0 | Implemented |
WV0501 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $372 | $327 | Implemented |
WV0501 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,062 | $649 | Implemented |
WV0501 # 08 Y:2015 | 08 | 2015 | INSULATE BARE EQUIPMENT | $1,262 | $2,533 | Not Implemented |
WV0501 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,751 | $7,185 | Not Implemented |
WV0501 # 06 Y:2015 | 06 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $2,432 | $400 | Implemented |
WV0501 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,359 | $0 | Not Implemented |
WV0501 # 04 Y:2015 | 04 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $3,486 | $5,200 | Implemented |
WV0501 # 03 Y:2015 | 03 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,928 | $1,000 | Implemented |
WV0501 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,534 | $26,699 | Not Implemented |
WV0501 # 01 Y:2015 | 01 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,166 | $24,000 | Not Implemented |
UM0442 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $4,900 | $3,000 | Implemented |
UM0442 # 03 Y:2014 | 03 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $10,229 | $5,000 | Implemented |
UM0442 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,315 | $40,000 | Implemented |
UM0442 # 01 Y:2014 | 01 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $143,338 | $477,600 | Not Implemented |
MA0718 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,029 | $1,000 | Implemented |
MA0718 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,409 | $26,750 | Not Implemented |
MA0718 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $200 | Implemented |