IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 321912 Cut Stock, Resawing Lumber, and Planing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0101 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,830 $20,375 Not Implemented
BS0101 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,063 $41,435 Not Implemented
BS0101 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,143 $525 Not Implemented
BS0101 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $10,844 $25,166 Not Implemented
BS0101 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $660 Not Implemented
BS0101 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,138 $1,400 Not Implemented
BS0072 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $48 Not Implemented
BS0072 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $1,323 Not Implemented
BS0072 # 07 Y:2016 07 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,023 $3,260 Not Implemented
BS0072 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $547 $582 Not Implemented
BS0072 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $240 $413 Not Implemented
BS0072 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,231 $15,400 Not Implemented
BS0072 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $217 $63 Not Implemented
BS0072 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $56 $47 Not Implemented
BS0021 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,418 $16,300 Not Implemented
BS0021 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $441 $973 Not Implemented
BS0021 # 05 Y:2013 05 2013 REPAIR OR REPLACE STEAM TRAPS $264,262 $84,783 Not Implemented
BS0021 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $311 $240 Not Implemented
BS0021 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $258 $1,952 Not Implemented
BS0021 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,574 $752 Not Implemented
BS0021 # 01 Y:2013 01 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $209,585 $54,045 Not Implemented
BS0005 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,970 $609 Implemented
BS0005 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,653 $7,846 Not Implemented
BS0005 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,615 $10,000 Implemented
BS0005 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,733 $178 Implemented