IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 321912 Cut Stock, Resawing Lumber, and Planing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0656 # 07 Y:2023 07 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,997 $1,500 n/a
WV0656 # 01 Y:2023 01 2023 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $114,700 $500,000 n/a
WV0656 # 11 Y:2023 11 2023 DEVELOP A REPAIR/REPLACE POLICY $1,896 $8,107 n/a
WV0656 # 02 Y:2023 02 2023 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,471 $75,000 n/a
WV0656 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $8,319 $1,861 n/a
WV0656 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,117 $9,888 n/a
WV0656 # 05 Y:2023 05 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,882 $17,230 n/a
WV0656 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,912 $637 n/a
WV0656 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $2,669 $13,005 n/a
WV0656 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,265 $1,350 n/a
WV0656 # 14 Y:2023 14 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,191 $1,070 n/a
WV0656 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $3,448 $14,655 n/a
WV0656 # 12 Y:2023 12 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,376 $1,500 n/a
WV0656 # 13 Y:2023 13 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,364 $3,507 n/a
WV0501 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,359 $0 Not Implemented
WV0501 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $327 Implemented
WV0501 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $1,062 $649 Implemented
WV0501 # 08 Y:2015 08 2015 INSULATE BARE EQUIPMENT $1,262 $2,533 Not Implemented
WV0501 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,751 $7,185 Not Implemented
WV0501 # 06 Y:2015 06 2015 REPAIR AND ELIMINATE STEAM LEAKS $2,432 $400 Implemented
WV0501 # 04 Y:2015 04 2015 REPAIR OR REPLACE STEAM TRAPS $3,486 $5,200 Implemented
WV0501 # 03 Y:2015 03 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,928 $1,000 Implemented
WV0501 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,534 $26,699 Not Implemented
WV0501 # 01 Y:2015 01 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $12,166 $24,000 Not Implemented
WV0274 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,432 $2,093 Not Implemented