IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
NAICS 321918 Other Millwork (including Flooring)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0589 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,386 $0 Not Implemented
OR0589 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,711 $6,200 Implemented
OR0589 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $53,151 Implemented
OR0589 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,028 $43,292 Not Implemented
WV0430 # 05 Y:2011 05 2011 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28,475 $76,200 Not Implemented
WV0430 # 09 Y:2011 09 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,265 $57,400 Not Implemented
WV0430 # 08 Y:2011 08 2011 COMBINE UTILITY METERS $10,426 $20,000 Not Implemented
WV0430 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,692 $37,460 Implemented
WV0430 # 06 Y:2011 06 2011 OPTIMIZE PLANT POWER FACTOR $25,696 $37,805 Not Implemented
WV0430 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $34,733 $26,650 Implemented
WV0430 # 03 Y:2011 03 2011 USE RADIANT HEATER FOR SPOT HEATING $39,290 $65,840 Not Implemented
WV0430 # 02 Y:2011 02 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,659 $3,500 Implemented
WV0430 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $70,581 $20,000 Not Implemented
TT0068 # 01 Y:2011 01 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $15,000 $300,000 Not Implemented
NC0408 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,189 $1,000 Implemented
NC0408 # 02 Y:2010 02 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $5,644 $1,689 Implemented
NC0408 # 03 Y:2010 03 2010 REPAIR OR REPLACE STEAM TRAPS $5,428 $5,500 Implemented
NC0408 # 04 Y:2010 04 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $712,007 $1,750,000 Implemented
NC0408 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $7,665 Implemented
NC0408 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $27,873 $53,873 Implemented
NC0408 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,195 $2,876 Implemented
NC0408 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $882 $924 Implemented
NC0408 # 09 Y:2010 09 2010 OPTIMIZE PLANT POWER FACTOR $11,133 $20,000 Not Implemented
NC0408 # 10 Y:2010 10 2010 DEVELOP A REPAIR/REPLACE POLICY $11,081 $2,538 Implemented
NC0408 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $100 Implemented