IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
NAICS 321918 Other Millwork (including Flooring)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0655 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,078 $12,517 Implemented
WV0655 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,005 $7,828 Implemented
WV0655 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,641 $210 Implemented
CC0019 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $50,204 $14,000 n/a
CC0019 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,143 $531,930 n/a
CC0019 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,039 $14,918 n/a
CC0019 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,021 $0 n/a
CC0019 # 02 Y:2023 02 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $80 $180 n/a
CC0019 # 01 Y:2023 01 2023 REDUCE VENTILATION AIR $264 $0 n/a
TT0301 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,720 $15,200 Implemented
TT0301 # 05 Y:2023 05 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,886 $220 Implemented
TT0301 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,899 $1,500 Implemented
TT0301 # 02 Y:2023 02 2023 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $40,702 $210,000 Not Implemented
TT0301 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,506 $76,760 Not Implemented
TT0301 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,607 $0 Implemented
LE0501 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,825 $20,000 Not Implemented
LE0501 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,133 $100 Implemented
LE0501 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $560 $500 Implemented
LE0501 # 05 Y:2021 05 2021 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $534 $1,240 Not Implemented
LE0501 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $985 $100 Implemented
LE0501 # 06 Y:2021 06 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,632 $36,000 Implemented
UA0228 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,664 $11,337 Not Implemented
UA0228 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,337 $1,553 Not Implemented
UA0228 # 01 Y:2020 01 2020 USE POWER DURING OFF-PEAK PERIODS $8,116 $100 Not Implemented
UA0228 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $164 $419 Not Implemented