Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
113
matching recommendationsNAICS | 321920 | Wood Container and Pallet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0615 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $941 | $1,884 | n/a |
SF0615 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,843 | $2,120 | n/a |
SF0615 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,570 | $0 | n/a |
SF0615 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,315 | $55,046 | n/a |
AS0525 # 01 Y:2022 | 01 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $66,619 | $458,235 | Not Implemented |
AS0525 # 02 Y:2022 | 02 | 2022 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $32,935 | $15,560 | Implemented |
AS0525 # 03 Y:2022 | 03 | 2022 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $22,011 | $1,900 | Implemented |
AS0525 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,910 | $12,950 | Implemented |
AS0525 # 05 Y:2022 | 05 | 2022 | APPLY FOR INVESTMENT INCENTIVES | $17,475 | $500 | Implemented |
AS0525 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,862 | $6,763 | Implemented |
AS0525 # 07 Y:2022 | 07 | 2022 | USE PHOTOCELL CONTROLS | $894 | $144 | Not Implemented |
AS0525 # 08 Y:2022 | 08 | 2022 | MAINTAIN MACHINES TO REDUCE LEAKS | $705 | $1,992 | Implemented |
LE0525 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $108,808 | $250,000 | Not Implemented |
LE0525 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,480 | $20,000 | Not Implemented |
LE0525 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,698 | $5,000 | Not Implemented |
LE0525 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $150 | Implemented |
LE0525 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $763 | $2,001 | Implemented |
LE0525 # 05 Y:2022 | 05 | 2022 | BURN WOOD BY-PRODUCTS FOR HEAT | $41,476 | $130,000 | Not Implemented |
MZ0298 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,093 | $1,639 | Implemented |
MZ0298 # 10 Y:2020 | 10 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $756 | $288 | Implemented |
MZ0298 # 09 Y:2020 | 09 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $29,362 | $25,600 | Not Implemented |
MZ0298 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,238 | $800 | Not Implemented |
MZ0298 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,731 | $2,790 | Implemented |
MZ0298 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,824 | $8,850 | Implemented |
MZ0298 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,146 | $350 | Implemented |