Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 32199 All Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0798 # 02 Y:2024 02 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $733 $2,196 n/a
OR0798 # 01 Y:2024 01 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,715 $502 n/a
OR0798 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,382 $4,736 n/a
OR0798 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $19,584 $93,860 n/a
OR0798 # 06 Y:2024 06 2024 USE RADIANT HEATER FOR SPOT HEATING $921 $8,538 n/a
OR0798 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $13,899 $90,000 n/a
OR0798 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,445 $64,276 n/a
OR0794 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,287 $5,523 n/a
OR0794 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $7,546 n/a
OR0794 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,236 $1,629 n/a
OR0794 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $20,545 $92,473 n/a
OR0794 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $12,662 $67,250 n/a
OR0794 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,489 $12,623 n/a
OR0767 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $5,428 Not Implemented
OR0767 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,793 $0 Not Implemented
OR0767 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $172,773 $37,200 Implemented
OR0767 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,167 $14,238 Not Implemented
OR0767 # 03 Y:2023 03 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,390 $200,000 Implemented
OR0722 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $42,047 $1,000 Implemented
OR0722 # 02 Y:2019 02 2019 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $17,875 $0 Implemented
OR0722 # 03 Y:2019 03 2019 USE OPTIMUM TEMPERATURE $6,191 $0 Not Implemented
OR0722 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,107 $0 Implemented
OR0722 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $1,110 Not Implemented
OR0722 # 06 Y:2019 06 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $28,751 $129,960 Not Implemented
OR0722 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,941 $15,179 Not Implemented