Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 32199 | All Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0798 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $733 | $2,196 | n/a |
OR0798 # 01 Y:2024 | 01 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,715 | $502 | n/a |
OR0798 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,382 | $4,736 | n/a |
OR0798 # 04 Y:2024 | 04 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $19,584 | $93,860 | n/a |
OR0798 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $921 | $8,538 | n/a |
OR0798 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,899 | $90,000 | n/a |
OR0798 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,445 | $64,276 | n/a |
OR0794 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,287 | $5,523 | n/a |
OR0794 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,153 | $7,546 | n/a |
OR0794 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,236 | $1,629 | n/a |
OR0794 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $20,545 | $92,473 | n/a |
OR0794 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,662 | $67,250 | n/a |
OR0794 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,489 | $12,623 | n/a |
OR0767 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,428 | $5,428 | Not Implemented |
OR0767 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,793 | $0 | Not Implemented |
OR0767 # 02 Y:2023 | 02 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $172,773 | $37,200 | Implemented |
OR0767 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,167 | $14,238 | Not Implemented |
OR0767 # 03 Y:2023 | 03 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $300,390 | $200,000 | Implemented |
OR0722 # 01 Y:2019 | 01 | 2019 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,047 | $1,000 | Implemented |
OR0722 # 02 Y:2019 | 02 | 2019 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $17,875 | $0 | Implemented |
OR0722 # 03 Y:2019 | 03 | 2019 | USE OPTIMUM TEMPERATURE | $6,191 | $0 | Not Implemented |
OR0722 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,107 | $0 | Implemented |
OR0722 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $1,110 | Not Implemented |
OR0722 # 06 Y:2019 | 06 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $28,751 | $129,960 | Not Implemented |
OR0722 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,941 | $15,179 | Not Implemented |