IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $360 Not Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
LE0195 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $575,674 $984,000 Not Implemented
LE0195 # 02 Y:2004 02 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $29,156 $14,088 Not Implemented
LE0195 # 03 Y:2004 03 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $33,048 $40,000 Not Implemented
LE0195 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,946 $48,000 Implemented
LE0195 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $16,168 $6,683 Implemented
LE0195 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,604 $40,000 Not Implemented
LE0195 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,095 $0 Implemented
LE0195 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,089 $0 Implemented
LE0195 # 09 Y:2004 09 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,529 $12,960 Not Implemented
LE0195 # 10 Y:2004 10 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,299 $1,200 Implemented
LE0195 # 11 Y:2004 11 2004 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $960 $200 Implemented
NC0289 # 01 Y:2004 01 2004 RECYCLE WASTE INK AND CLEANUP SOLVENT $21,873 $25,000 Implemented
NC0289 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,527 $0 Not Implemented
NC0289 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $230 $154 Not Implemented
NC0289 # 04 Y:2004 04 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $972 $1,000 Not Implemented
LE0191 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,209 $8,000 Not Implemented
LE0191 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,043 $2,500 Implemented
LE0191 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,591 $3,200 Not Implemented