IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0725 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,381 $15,200 Not Implemented
MA0725 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,977 $12,270 Implemented
MA0725 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,970 $13,450 Not Implemented
MA0725 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,314 $10,600 Implemented
MA0725 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,444 $10,200 Not Implemented
MA0725 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $3,366 $30,760 Implemented
IP0019 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,290 $0 Not Implemented
IP0019 # 02 Y:2013 02 2013 APPLY FOR INVESTMENT INCENTIVES $166 $0 Not Implemented
IP0019 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $0 Implemented
IP0019 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,885 $164 Implemented
IP0019 # 05 Y:2013 05 2013 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $668 $715 Not Implemented
IP0019 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,889 $3,258 Implemented
IP0019 # 07 Y:2013 07 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $640 $957 Not Implemented
UD0894 # 01 Y:2013 01 2013 USE MINIMUM COOLING WATER TO BEARINGS $17,378 $0 Not Implemented
UD0894 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,885 $0 Implemented
UD0894 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,290 $0 Implemented
UD0894 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $17,944 $8,000 Not Implemented
UD0894 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,638 $10,000 Not Implemented
UD0894 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,426 $0 Not Implemented
UD0894 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $142 $350 Implemented
UD0894 # 08 Y:2013 08 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $12,240 $30,550 Not Implemented
UD0894 # 09 Y:2013 09 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,400 $40,600 Not Implemented
CO0680 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,930 $1,310 Implemented
CO0680 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,370 $31,720 Not Implemented
CO0680 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $490 $230 Implemented