Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,971
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0725 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,381 | $15,200 | Not Implemented |
MA0725 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,977 | $12,270 | Implemented |
MA0725 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,970 | $13,450 | Not Implemented |
MA0725 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,314 | $10,600 | Implemented |
MA0725 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $10,200 | Not Implemented |
MA0725 # 12 Y:2014 | 12 | 2014 | INSULATE BARE EQUIPMENT | $3,366 | $30,760 | Implemented |
IP0019 # 01 Y:2013 | 01 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,290 | $0 | Not Implemented |
IP0019 # 02 Y:2013 | 02 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $166 | $0 | Not Implemented |
IP0019 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $493 | $0 | Implemented |
IP0019 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,885 | $164 | Implemented |
IP0019 # 05 Y:2013 | 05 | 2013 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $668 | $715 | Not Implemented |
IP0019 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,889 | $3,258 | Implemented |
IP0019 # 07 Y:2013 | 07 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $640 | $957 | Not Implemented |
UD0894 # 01 Y:2013 | 01 | 2013 | USE MINIMUM COOLING WATER TO BEARINGS | $17,378 | $0 | Not Implemented |
UD0894 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,885 | $0 | Implemented |
UD0894 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,290 | $0 | Implemented |
UD0894 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $17,944 | $8,000 | Not Implemented |
UD0894 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,638 | $10,000 | Not Implemented |
UD0894 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,426 | $0 | Not Implemented |
UD0894 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $142 | $350 | Implemented |
UD0894 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $12,240 | $30,550 | Not Implemented |
UD0894 # 09 Y:2013 | 09 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,400 | $40,600 | Not Implemented |
CO0680 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,930 | $1,310 | Implemented |
CO0680 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,370 | $31,720 | Not Implemented |
CO0680 # 03 Y:2013 | 03 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $490 | $230 | Implemented |