IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0542 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $1,900 Implemented
LE0542 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,492 $12,810 Implemented
LE0542 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,898 $60,000 Not Implemented
UC2301 # 01 Y:2023 01 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,647 $0 Not Implemented
UC2301 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $600 Not Implemented
UC2301 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $407 $600 Not Implemented
UC2301 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $552 $2,800 Not Implemented
UC2301 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $669 $3,250 Not Implemented
UC2301 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $1,959 $1,200 Not Implemented
UC2301 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $21,858 $127,920 Not Implemented
DL0218 # 01 Y:2023 01 2023 REDUCE VENTILATION AIR $11,809 $0 Implemented
DL0218 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $90,882 $0 Implemented
DL0218 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,402 $750 Implemented
DL0218 # 04 Y:2023 04 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $10,992 $10,000 Not Implemented
DL0218 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,159 $10,000 Implemented
DL0218 # 06 Y:2023 06 2023 INSTALL SET-BACK TIMERS $473 $1,000 Not Implemented
CM1015 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $139,944 $1,455,428 Not Implemented
CM1015 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,380 $23,925 Implemented
CM1015 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $30,725 $8,000 Not Implemented
CM1015 # 04 Y:2022 04 2022 REPLACE BOILER $9,756 $43,140 Implemented
CM1015 # 05 Y:2022 05 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $578 $1,310 Not Implemented
GT0961 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58,279 $1,850 Implemented
GT0961 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,116 $800 Implemented
GT0961 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,851 $900 Implemented
GT0961 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,776 $4,480 Implemented