IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0602 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $79,413 $172,300 Not Implemented
MA0602 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $71,115 $115,075 Not Implemented
MA0602 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,335 $96,992 Implemented
MA0602 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,691 $749 Implemented
MA0602 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $8,388 $4,050 Implemented
MA0602 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,526 $8,755 Not Implemented
MA0602 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $1,918 $700 Not Implemented
MA0602 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $1,122 $950 Implemented
UU0099 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
UU0099 # 02 Y:2006 02 2006 ISOLATE HOT OR COLD EQUIPMENT $1,350 $0 Not Implemented
UU0099 # 03 Y:2006 03 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,960 $164,490 Not Implemented
UU0099 # 04 Y:2006 04 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,029 $7,500 Not Implemented
UU0099 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,100 $21,000 Not Implemented
UU0099 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,230 $2,510 Implemented
UU0099 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $8,020 $14,000 Not Implemented
MA0601 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $147,022 $129,390 Implemented
MA0601 # 02 Y:2006 02 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $71,974 $10,118 Not Implemented
MA0601 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,368 $24,444 Implemented
MA0601 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,148 $18,975 Implemented
MA0601 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,090 $2,300 Not Implemented
IC0114 # 01 Y:2006 01 2006 INSTALL TURBULATORS $42,000 $7,500 Not Implemented
IC0114 # 02 Y:2006 02 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $16,000 $84,000 Not Implemented
IC0114 # 03 Y:2006 03 2006 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,000 $63,000 Implemented
IC0114 # 04 Y:2006 04 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $175,000 $120,400 Not Implemented
IC0114 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,400 $16,800 Not Implemented