Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,971
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0094 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,187 | $34,080 | Not Implemented |
LM0094 # 05 Y:2005 | 05 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,628 | $0 | Not Implemented |
UM0276 # 01 Y:2005 | 01 | 2005 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $206,100 | $96,000 | Implemented |
UM0276 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,572 | $2,500 | Implemented |
UM0276 # 03 Y:2005 | 03 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $663,486 | $7,500,000 | Not Implemented |
UM0275 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $193,508 | $1,140,000 | Not Implemented |
UM0275 # 02 Y:2005 | 02 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,025 | $12,250 | Not Implemented |
UM0275 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,372 | $25,936 | Not Implemented |
UM0275 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,025 | $1,800 | Implemented |
UM0275 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,898 | $500 | Implemented |
UM0275 # 06 Y:2005 | 06 | 2005 | REDUCE VENTILATION AIR | $7,113 | $5,492 | Not Implemented |
UM0275 # 07 Y:2005 | 07 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,883 | $3,000 | Implemented |
UM0275 # 08 Y:2005 | 08 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $4,727 | $50 | Implemented |
UM0275 # 09 Y:2005 | 09 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,909 | $1,000 | Implemented |
SD0356 # 01 Y:2005 | 01 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $5,391 | $11,000 | Implemented |
SD0356 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,992 | $14,000 | Implemented |
SD0356 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,583 | $7,647 | Not Implemented |
SD0356 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,351 | $120 | Implemented |
SD0356 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,151 | $0 | Not Implemented |
SD0356 # 06 Y:2005 | 06 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $18,769 | $25,650 | Not Implemented |
SD0356 # 07 Y:2005 | 07 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,230 | $18,500 | Not Implemented |
WI0485 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,442 | $32,548 | Not Implemented |
WI0485 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,838 | $14,420 | Implemented |
WI0485 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,926 | $3,443 | Not Implemented |
WI0485 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,641 | $7,095 | Implemented |