IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2304 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $231 $332 Not Implemented
UW2304 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $848 $937 Implemented
UW2304 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $148,199 $381,066 Implemented
UW2304 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,854 $372 Implemented
UW2304 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $28,885 $0 Implemented
UW2211 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,186 $1,771 Implemented
UW2211 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $708 $760 Implemented
UW2211 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,539 $5,669 Implemented
UW2211 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,053 $286 Implemented
UW2211 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $6,616 Implemented
OR0688 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,431 $448 Implemented
OR0688 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,049 $0 Not Implemented
OR0688 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,165 $0 Not Implemented
OR0688 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,221 $180,000 Implemented
OR0675 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,809 $23,810 Implemented
OR0675 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,062 $1,969 Implemented
OR0675 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO MOVE PRODUCT $79,123 $89,654 Implemented
OR0675 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $7,215 Not Implemented
OR0615 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,601 $4,986 Implemented
OR0615 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,352 $36,600 Not Implemented
OR0615 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,731 $17,127 Implemented
OR0615 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $791,616 $300,000 Not Implemented
OR0615 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $48,896 $68,866 Implemented
OR0615 # 01 Y:2013 01 2013 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $24,283 $1,000 Implemented
UW0048 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,203 $2,440 Not Implemented