Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 32212 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0727 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,761 | $1,598 | Not Implemented |
MA0727 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,084 | $127,730 | Not Implemented |
MA0727 # 05 Y:2014 | 05 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,122 | $1,500 | Implemented |
MA0727 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,693 | $153,000 | Not Implemented |
MA0727 # 03 Y:2014 | 03 | 2014 | PAY UTILITY BILLS ON TIME | $6,481 | $500 | Implemented |
MA0725 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,977 | $12,270 | Implemented |
MA0725 # 04 Y:2014 | 04 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $74,123 | $120,280 | Not Implemented |
MA0725 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $77,937 | $10,000 | Not Implemented |
MA0725 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $263,264 | $594,880 | Not Implemented |
MA0725 # 01 Y:2014 | 01 | 2014 | BURN A LESS EXPENSIVE GRADE OF FUEL | $1,049,475 | $2,750,000 | Implemented |
MA0725 # 05 Y:2014 | 05 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $28,833 | $9,690 | Implemented |
MA0725 # 06 Y:2014 | 06 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $23,788 | $9,000 | Implemented |
MA0725 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,381 | $15,200 | Not Implemented |
MA0725 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,970 | $13,450 | Not Implemented |
MA0725 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,314 | $10,600 | Implemented |
MA0725 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $10,200 | Not Implemented |
MA0725 # 12 Y:2014 | 12 | 2014 | INSULATE BARE EQUIPMENT | $3,366 | $30,760 | Implemented |
MA0642 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $251 | $120 | Implemented |
MA0642 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $391 | $900 | Not Implemented |
MA0642 # 05 Y:2008 | 05 | 2008 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,273 | $5,500 | Not Implemented |
MA0642 # 04 Y:2008 | 04 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $6,500 | Not Implemented |
MA0642 # 03 Y:2008 | 03 | 2008 | REDUCE VENTILATION AIR | $3,315 | $1,000 | Not Implemented |
MA0642 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,095 | $4,354 | Not Implemented |
MA0642 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,279 | $27,924 | Implemented |
MA0566 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,400 | $20,000 | Implemented |