Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 32212 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0732 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,149 | $2,491 | Implemented |
OK0732 # 02 Y:2006 | 02 | 2006 | OPTIMIZE PLANT POWER FACTOR | $23,061 | $32,500 | Not Implemented |
OK0732 # 03 Y:2006 | 03 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $18,843 | $17,500 | Implemented |
OK0732 # 04 Y:2006 | 04 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,602 | $1,223 | Implemented |
OK0732 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,800 | $1,241 | Implemented |
OK0732 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,627 | $3,627 | Implemented |
OK0732 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,116 | $1,065 | Implemented |
OK0732 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $685 | $685 | Not Implemented |
LE0236 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $123,125 | $25,000 | Not Implemented |
LE0236 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,309 | $700 | Not Implemented |
LE0236 # 01 Y:2006 | 01 | 2006 | REDESIGN PROCESS | $328,340 | $1,000,000 | Not Implemented |
LE0236 # 03 Y:2006 | 03 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $23,441 | $17,600 | Not Implemented |
LE0236 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $22,758 | $42,650 | Not Implemented |
LE0236 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $15,083 | $2,500 | Implemented |
LE0236 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,063 | $2,750 | Not Implemented |
LE0236 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,742 | $300 | Not Implemented |
LE0236 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,686 | $300 | Not Implemented |
LL0249 # 01 Y:2006 | 01 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $158,452 | $8,830 | Implemented |
LL0249 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $2,138 | $1,422 | Not Implemented |
LL0249 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $5,919 | $1,740 | Not Implemented |
LL0249 # 06 Y:2006 | 06 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,963 | $105 | Not Implemented |
LL0249 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,012 | $4,200 | Not Implemented |
LL0249 # 04 Y:2006 | 04 | 2006 | USE PHOTOCELL CONTROLS | $85,337 | $5,520 | Not Implemented |
LL0249 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $111,014 | $18,240 | Implemented |
LL0249 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $120,454 | $320 | Not Implemented |