IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

446

matching recommendations
Reset
NAICS 322121 Paper (except Newsprint) Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0297 # 05 Y:2010 05 2010 REPAIR OR REPLACE STEAM TRAPS $29,835 $5,275 Implemented
SU0297 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,260 $650 Implemented
SU0297 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $5,273 $2,136 Not Implemented
SU0297 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $18,693 $24,129 Implemented
SU0297 # 09 Y:2010 09 2010 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $314,524 $658,300 Not Implemented
SU0297 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,058 $45,795 Implemented
SU0297 # 11 Y:2010 11 2010 UPGRADE OBSOLETE EQUIPMENT $1,054 $4,725 Implemented
MI0188 # 01 Y:2010 01 2010 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $500,499 $0 Implemented
MI0188 # 02 Y:2010 02 2010 USE POWER DURING OFF-PEAK PERIODS $45,276 $2,000 Not Implemented
MI0188 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,782 $60 Implemented
MI0188 # 04 Y:2010 04 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $38,905 $0 Not Implemented
MI0188 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,420 $920 Implemented
MI0188 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,600 $1,920 Implemented
MI0188 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,952 $3,680 Not Implemented
MI0188 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $3,050 $2,904 Implemented
MI0188 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,341 $1,800 Implemented
MI0188 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,536 $1,500 Implemented
MA0642 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,279 $27,924 Implemented
MA0642 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,095 $4,354 Not Implemented
MA0642 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $3,315 $1,000 Not Implemented
MA0642 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $6,500 Not Implemented
MA0642 # 05 Y:2008 05 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,273 $5,500 Not Implemented
MA0642 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $391 $900 Not Implemented
MA0642 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $120 Implemented
MS0327 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $41,488 $312 Implemented