IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
NAICS 32213 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0145 # 04 Y:2021 04 2021 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $213,186 $665,875 Not Implemented
IP0145 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $24,768 $21,741 Not Implemented
IP0145 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $88,444 $27,000 Not Implemented
IP0145 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,611 $17,283 Not Implemented
IP0145 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,236 $12,797 Not Implemented
AM0787 # 02 Y:2019 02 2019 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $312,044 $849,614 Not Implemented
AM0787 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $399 $280 Not Implemented
AM0787 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,577 $2,640 Implemented
AM0787 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,322 $825 Implemented
AM0787 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $70,814 $178,864 Implemented
AM0787 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $13,271 $14,560 Implemented
AM0787 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $56,595 $10,440 Implemented
AM0787 # 01 Y:2019 01 2019 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $290,927 $1,011,274 Not Implemented
OK0986 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,456 $4,000 Implemented
OK0986 # 11 Y:2018 11 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $357 $183 Not Implemented
OK0986 # 12 Y:2018 12 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,065 $85,003 Implemented
OK0986 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,208 $4,556 Implemented
OK0986 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,819 $4,198 Implemented
OK0986 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $107,913 $4,800 Implemented
OK0986 # 10 Y:2018 10 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $546 $1,200 Not Implemented
OK0986 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $6,038 Implemented
OK0986 # 03 Y:2018 03 2018 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $698 $356 Not Implemented
OK0986 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,714 $381 Not Implemented
OK0986 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,402 Implemented
OK0986 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,941 $16,934 Implemented