Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
967
matching recommendationsNAICS | 3222 | Converted Paper Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0465 # 11 Y:2012 | 11 | 2012 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,007 | $1,000 | Implemented |
DL0091 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,580 | $2,500 | Implemented |
DL0091 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $300 | Implemented |
CO0660 # 01 Y:2012 | 01 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $510 | $3,090 | Implemented |
CO0660 # 02 Y:2012 | 02 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,610 | $500 | Implemented |
WM0003 # 01 Y:2012 | 01 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,254 | $600 | Implemented |
WM0003 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $226 | $120 | Implemented |
WM0003 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $137 | $360 | Implemented |
LE0336 # 01 Y:2012 | 01 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $18,760 | $150 | Implemented |
LE0336 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,173 | $1,000 | Implemented |
LE0336 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,242 | $16,000 | Implemented |
LE0336 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,734 | $8,000 | Implemented |
LE0336 # 06 Y:2012 | 06 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,840 | $3,000 | Implemented |
LE0336 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,762 | $25 | Implemented |
LE0336 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,616 | $650 | Implemented |
MAS019 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,186 | $1,500 | Implemented |
MAS019 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,117 | $0 | Implemented |
MAS019 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $375 | $0 | Implemented |
SF0403 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,239 | $720 | Implemented |
SF0403 # 02 Y:2011 | 02 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,307 | $2,006 | Implemented |
SF0403 # 03 Y:2011 | 03 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $681 | $1,471 | Implemented |
SF0403 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $1,801 | $5,900 | Implemented |
SF0403 # 08 Y:2011 | 08 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,944 | $9,877 | Implemented |
GT0886 # 02 Y:2011 | 02 | 2011 | METER WASTE WATER | $5,529 | $2,500 | Implemented |
GT0886 # 03 Y:2011 | 03 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $3,617 | $9,994 | Implemented |