Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0480 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,044 $9,363 Implemented
AS0480 # 01 Y:2020 01 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,992 $66,000 Implemented
AS0480 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $605 $2,300 Not Implemented
AS0480 # 04 Y:2020 04 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,442 $5,500 Not Implemented
AS0480 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,276 $9,045 Not Implemented
AS0455 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,307 $180 Implemented
AS0455 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,768 $800 Not Implemented
AS0455 # 05 Y:2018 05 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $114,480 $30,000 Implemented
AS0455 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,551 $12,598 Implemented
AS0455 # 06 Y:2018 06 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,556 $0 Not Implemented
AS0455 # 07 Y:2018 07 2018 PAY BILLS ON TIME TO AVOID LATE FEES $15,576 $0 Not Implemented
AS0455 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,097 $36,012 Implemented
SD0430 # 01 Y:2010 01 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $264 $0 Not Implemented
SD0430 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,671 Not Implemented
SD0430 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,152 $100 Not Implemented
SD0430 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,949 $800 Implemented
SD0430 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,126 $1,029 Not Implemented
AS0409 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,404 $11,000 Not Implemented
AS0409 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $13,305 $10,000 Not Implemented
AS0409 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,055 $8,000 Not Implemented
AS0409 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,097 $10,861 Not Implemented
AS0409 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $1,730 $4,650 Not Implemented
AS0409 # 06 Y:2005 06 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,337 $1,000 Not Implemented
AS0409 # 07 Y:2005 07 2005 USE SOLAR HEAT TO HEAT WATER $1,555 $12,000 Not Implemented
AS0392 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,774 $4,055 Not Implemented