IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0052 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,546 $1,000 Not Implemented
MZ0052 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $9,103 $8,984 Implemented
MZ0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,361 $18,360 Implemented
MZ0052 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,855 $16,700 Implemented
MZ0052 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,921 $1,160 Not Implemented
OK0721 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $323 $0 Not Implemented
OK0721 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $289 $1,373 Not Implemented
OK0721 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $13,148 Implemented
OK0721 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,586 $31,632 Implemented
OK0721 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,540 $7,400 Not Implemented
OK0721 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $415 Implemented
IC0078 # 13 Y:2004 13 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $260 $0 n/a
IC0078 # 14 Y:2004 14 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $3,949 $750 n/a
IC0078 # 01 Y:2004 01 2004 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $41,155 $96,800 n/a
IC0078 # 12 Y:2004 12 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,626 $955 n/a
IC0078 # 11 Y:2004 11 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $819 $920 n/a
IC0078 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,252 n/a
IC0078 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,026 $142,221 n/a
IC0078 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $222 $75 n/a
IC0078 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $1,700 n/a
IC0078 # 06 Y:2004 06 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $1,999 $11,950 n/a
IC0078 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,304 $900 n/a
IC0078 # 04 Y:2004 04 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,992 $0 n/a
IC0078 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,520 $33,750 n/a
IC0078 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,540 $2,212 n/a