Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
306
matching recommendationsNAICS | 3222 | Converted Paper Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0110 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $262,812 | $4,671,994 | n/a |
NL0110 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,063 | $4,500 | n/a |
NL0110 # 04 Y:2025 | 04 | 2025 | METER WASTE WATER | $4,494 | $2,400 | n/a |
NL0110 # 05 Y:2025 | 05 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $527 | $700 | n/a |
NL0110 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,360 | $160 | n/a |
WM0241 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $96 | $368 | n/a |
WM0241 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,950 | $0 | n/a |
WM0241 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,471 | $2,249 | n/a |
WM0241 # 02 Y:2025 | 02 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,959 | $6,000 | n/a |
WM0241 # 04 Y:2025 | 04 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $552 | $635 | n/a |
NT0040 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,568 | $5,609 | n/a |
NT0040 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,649 | $5,965 | n/a |
NT0040 # 03 Y:2025 | 03 | 2025 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $150,000 | $12,000 | n/a |
NT0040 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,238 | $0 | n/a |
NT0040 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $3,165 | $5,000 | n/a |
SD0663 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,214 | $18,590 | n/a |
SD0663 # 10 Y:2025 | 10 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,427 | $3,278 | n/a |
SD0663 # 11 Y:2025 | 11 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,593 | $35,000 | n/a |
SD0663 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,060 | $4,266 | n/a |
SD0663 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,191 | $0 | n/a |
SD0663 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $314,276 | $12,865 | n/a |
SD0663 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,102 | $3,252 | n/a |
SD0663 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,623 | $500 | n/a |
SD0663 # 09 Y:2025 | 09 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,465 | $3,200 | n/a |
SD0663 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,107 | $2,287 | n/a |