IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $1,032 $662 Not Implemented
NC0360 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $12,267 $0 Implemented
NC0360 # 08 Y:2007 08 2007 USE PHOTOCELL CONTROLS $761 $750 Implemented
NC0360 # 03 Y:2007 03 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $35,946 $33,785 Not Implemented
NC0360 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $9,594 $2,250 Implemented
NC0360 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $300 Implemented
NC0360 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $12,731 $12,000 Implemented
NC0360 # 01 Y:2007 01 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,317 $10,000 Implemented
NC0340 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,146 $1,700 Not Implemented
NC0340 # 13 Y:2006 13 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $61,400 $25,000 Not Implemented
NC0340 # 12 Y:2006 12 2006 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $18,650 $20,000 Not Implemented
NC0340 # 11 Y:2006 11 2006 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $20,000 $20,000 Implemented
NC0340 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $50 Implemented
NC0340 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129 $377 Not Implemented
NC0340 # 08 Y:2006 08 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $500 Implemented
NC0340 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,998 $0 Implemented
NC0340 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,698 $7,600 Not Implemented
NC0340 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $879 $220 Implemented
NC0340 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $4,704 $1,500 Implemented
NC0340 # 02 Y:2006 02 2006 CLOSE OFF UNNEEDED STEAM LINES $13,322 $0 Implemented
NC0340 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $1,720 $1,800 Implemented
NC0322 # 01 Y:2005 01 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $139,400 $9,500 Implemented
NC0322 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $100 Implemented
NC0322 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,592 $821 Implemented
NC0322 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $74,009 $100,000 Not Implemented