IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,433

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0075 # 06 Y:2016 06 2016 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $73,741 $24,334 Implemented
IP0070 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $575 $0 Not Implemented
IP0070 # 02 Y:2016 02 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,543 $74 Implemented
IP0070 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,137 $40 Implemented
IP0070 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $996 $113 Implemented
IP0070 # 05 Y:2016 05 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $492 $720 Not Implemented
IP0070 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,285 $9,938 Not Implemented
OK0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $40,741 $19,000 Implemented
OK0943 # 02 Y:2016 02 2016 PAY UTILITY BILLS ON TIME $21,826 $0 Implemented
OK0943 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,211 $0 Implemented
OK0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $250 Not Implemented
OK0943 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,584 $1,350 Not Implemented
OK0943 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $645 $1,405 Implemented
OK0943 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,445 $11,700 Implemented
OK0943 # 08 Y:2016 08 2016 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,953 $4,600 Implemented
OK0943 # 09 Y:2016 09 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,934 $2,720 Implemented
OK0943 # 10 Y:2016 10 2016 INSTALL SET-BACK TIMERS $1,250 $790 Implemented
OK0943 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,334 $21,372 Implemented
OK0943 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $861 $4,032 Implemented
AM0710 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $9,400 $9,540 Not Implemented
AM0710 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $27 Implemented
AM0710 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,600 $1,160 Implemented
AM0710 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $2,944 $0 Implemented
AM0710 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,635 $0 Implemented
AM0710 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,170 $2,100 Implemented