Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 322211 | Corrugated and Solid Fiber Box Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0612 # 08 Y:2024 | 08 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,481 | $5,900 | Implemented |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | Implemented |
UF0612 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $13,749 | $3,750 | Implemented |
UF0612 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,735 | $34,020 | Implemented |
UF0612 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,865 | $8,523 | Implemented |
UF0612 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,994 | $20,000 | Implemented |
UF0612 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,068 | $30,945 | Implemented |
UF0391 # 12 Y:2006 | 12 | 2006 | USE PHOTOCELL CONTROLS | $1,978 | $30 | Implemented |
UF0391 # 09 Y:2006 | 09 | 2006 | USE OPTIMUM THICKNESS INSULATION | $325 | $84 | Implemented |
UF0391 # 08 Y:2006 | 08 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $803 | $0 | Implemented |
UF0391 # 06 Y:2006 | 06 | 2006 | CLOSE OFF UNNEEDED STEAM LINES | $9,659 | $0 | Implemented |
UF0391 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,679 | $0 | Implemented |
UF0391 # 04 Y:2006 | 04 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $8,241 | $404 | Implemented |
UF0391 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,054 | $403 | Implemented |
UF0391 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,932 | $0 | Implemented |
MI0114 # 08 Y:2005 | 08 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,882 | $0 | Implemented |
MI0114 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,896 | $1,074 | Implemented |
MI0114 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,392 | $77 | Implemented |
MI0114 # 05 Y:2005 | 05 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,790 | $4,360 | Implemented |
MI0114 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $2,983 | $225 | Implemented |
MI0114 # 02 Y:2005 | 02 | 2005 | IMPROVE COMBUSTION CONTROL CAPABILITY | $20,574 | $30,050 | Implemented |
UF0335 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,790 | $13,573 | Implemented |
UF0335 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,359 | $376 | Implemented |
UF0335 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,237 | $20,000 | Implemented |
UF0335 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,089 | $41,729 | Implemented |