IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 322211 Corrugated and Solid Fiber Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0581 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $2,508 $5,865 Not Implemented
NC0581 # 07 Y:2016 07 2016 BURN WASTE OIL FOR HEAT $1,336 $5,400 Not Implemented
NC0581 # 06 Y:2016 06 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,569 $25,000 Not Implemented
NC0581 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,139 $3,000 Not Implemented
NC0581 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $155 $200 Implemented
NC0581 # 03 Y:2016 03 2016 USE PHOTOCELL CONTROLS $1,319 $1,000 Not Implemented
NC0581 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,986 $45,747 Implemented
NC0581 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,175 $500 Not Implemented
NC0384 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $271 Implemented
NC0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,112 $500 Implemented
NC0384 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $5,000 Implemented
NC0384 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $1,428 $3,142 Not Implemented
NC0384 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,929 $7,700 Not Implemented
NC0384 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,352 $100 Implemented
NC0384 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,481 $5,000 Implemented
NC0341 # 01 Y:2006 01 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,414 $25,000 Not Implemented
NC0341 # 06 Y:2006 06 2006 DEVELOP STANDARD OPERATING PROCEDURES $55,756 $2,540 Not Implemented
NC0341 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $353 $100 Implemented
NC0341 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $1,455 $929 Not Implemented
NC0341 # 03 Y:2006 03 2006 DISCONNECT BALLASTS $1,454 $1,650 Not Implemented
NC0341 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $9,082 $100 Not Implemented