IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

328

matching recommendations
Reset
NAICS 322212 Folding Paperboard Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0346 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,141 $20,000 Implemented
NC0346 # 06 Y:2006 06 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,687 $1,485 Not Implemented
NC0346 # 07 Y:2006 07 2006 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,249 $2,000 Not Implemented
NC0346 # 08 Y:2006 08 2006 DEVELOP A REPAIR/REPLACE POLICY $2,023 $1,654 Implemented
NC0346 # 09 Y:2006 09 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,683 $0 Not Implemented
NC0346 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $753 $50 Implemented
NC0346 # 11 Y:2006 11 2006 USE PHOTOCELL CONTROLS $376 $400 Implemented
NC0346 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,209 $1,803 Not Implemented
NC0346 # 13 Y:2006 13 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,332 $200 Not Implemented
LE0227 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,579 $40,000 Not Implemented
LE0227 # 02 Y:2006 02 2006 REPLACE BOILER $39,147 $143,000 Not Implemented
LE0227 # 03 Y:2006 03 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $18,895 $42,000 Not Implemented
LE0227 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,727 $1,000 Not Implemented
LE0227 # 05 Y:2006 05 2006 $8,000 $7,900 Not Implemented
LE0227 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,005 $500 Not Implemented
LE0227 # 07 Y:2006 07 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,617 $1,200 Not Implemented
TA0108 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,100 $22,000 Not Implemented
TA0108 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $2,910 $495 Implemented
TA0108 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $120 Implemented
TA0108 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,590 $0 Implemented
TA0108 # 05 Y:2005 05 2005 USE MINIMUM SAFE OVEN VENTILATION $300 $0 Not Implemented
TA0108 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,530 $11,050 Implemented
AS0409 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,404 $11,000 Not Implemented
AS0409 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $13,305 $10,000 Not Implemented
AS0409 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,055 $8,000 Not Implemented