Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 322219 Other Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0218 # 01 Y:2023 01 2023 REDUCE VENTILATION AIR $11,809 $0 Implemented
DL0218 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $90,882 $0 Implemented
DL0218 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,402 $750 Implemented
DL0218 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,159 $10,000 Implemented
SD0566 # 03 Y:2018 03 2018 USE PHOTOCELL CONTROLS $13,413 $3,068 Implemented
SD0566 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,156 $5,358 Implemented
SD0566 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,548 $4,000 Implemented
SD0566 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,996 $72,976 Implemented
SD0566 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $100,744 $336,960 Implemented
SD0564 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $17,517 $86,400 Implemented
SU0452 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,109 $0 Implemented
SU0452 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $524 Implemented
SU0452 # 05 Y:2017 05 2017 UPGRADE OBSOLETE EQUIPMENT $25,555 $120,000 Implemented
SU0452 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $16,784 $4,317 Implemented
OR0675 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO MOVE PRODUCT $79,123 $89,654 Implemented
OR0675 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,062 $1,969 Implemented
OR0675 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,809 $23,810 Implemented
MZ0181 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,719 $0 Implemented
WM0042 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,231 $300 Implemented
WM0042 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,162 $9,680 Implemented
WM0042 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $322 $340 Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
SF0368 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,195 $0 Implemented
SF0368 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,812 $56,073 Implemented