IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 322219 Other Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0406 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,805 $48,176 Implemented
SD0406 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $1,477 Implemented
SD0406 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $3,110 Implemented
SD0406 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,339 $6,365 Implemented
MI0138 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,928 $1,074 Implemented
CO0590 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $560 $658 Implemented
CO0590 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $560 $500 Implemented
CO0590 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,280 $680 Implemented
CO0590 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $500 Implemented
CO0590 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,660 $100 Implemented
LE0229 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $1,000 Implemented
LE0229 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,981 $500 Implemented
LE0229 # 04 Y:2006 04 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $16,904 $34,000 Implemented
LE0229 # 03 Y:2006 03 2006 RECYCLE WASTE INK AND CLEANUP SOLVENT $36,000 $50,000 Implemented
LE0229 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $64,670 $27,200 Implemented
MA0556 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,720 $10,350 Implemented
MA0556 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $13,042 $6,750 Implemented
MA0556 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,131 Implemented
MA0556 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,167 $10,200 Implemented
MA0556 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,534 $529 Implemented
TA0064 # 01 Y:2003 01 2003 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,350 $1,800 Implemented
TA0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,770 $0 Implemented
TA0064 # 05 Y:2003 05 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,740 $520 Implemented
TA0064 # 07 Y:2003 07 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $101 $211 Implemented