Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
444
matching recommendationsNAICS | 32222 | Paper Bag and Coated and Treated Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0320 # 06 Y:2006 | 06 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,670 | $30,700 | Not Implemented |
WI0498 # 01 Y:2005 | 01 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $0 | $0 | Not Implemented |
WI0498 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,520 | $17,500 | Not Implemented |
WI0498 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,079 | $20,340 | Not Implemented |
WI0498 # 04 Y:2005 | 04 | 2005 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $11,414 | $21,105 | Not Implemented |
WI0498 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,036 | $11,640 | Not Implemented |
WI0498 # 06 Y:2005 | 06 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $3,268 | $0 | Not Implemented |
WI0498 # 07 Y:2005 | 07 | 2005 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,638 | $7,500 | Not Implemented |
WI0498 # 08 Y:2005 | 08 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,161 | $0 | Not Implemented |
WI0498 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $640 | Not Implemented |
WI0498 # 10 Y:2005 | 10 | 2005 | INSTALL OCCUPANCY SENSORS | $509 | $600 | Not Implemented |
WI0494 # 01 Y:2005 | 01 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,360 | $11,500 | Not Implemented |
WI0494 # 02 Y:2005 | 02 | 2005 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $12,456 | $16,500 | Not Implemented |
WI0494 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,231 | $12,960 | Implemented |
WI0494 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,060 | $6,060 | Not Implemented |
WI0494 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,037 | $1,000 | Not Implemented |
WI0494 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $207 | $640 | Not Implemented |
WV0314 # 01 Y:2005 | 01 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,732 | $3,713 | Implemented |
WV0314 # 02 Y:2005 | 02 | 2005 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $14,277 | $70 | Implemented |
WV0314 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,828 | $0 | Implemented |
WV0314 # 04 Y:2005 | 04 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,156 | $9,591 | Not Implemented |
WV0314 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,404 | $5,877 | Not Implemented |
WV0314 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,829 | $605 | Implemented |
WV0314 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $1,552 | $404 | Implemented |
WV0314 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $105 | Implemented |