Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 322220 | Paper Bag and Coated and Treated Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,051 | $340 | Implemented |
UD1025 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $4,000 | Not Implemented |
UD1025 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $83,809 | $25,133 | Not Implemented |
UD1025 # 05 Y:2020 | 05 | 2020 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,710 | $5,224 | Not Implemented |
UD1025 # 06 Y:2020 | 06 | 2020 | COMBINE UTILITY METERS | $8,278 | $0 | Not Implemented |
UD1025 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $3,612 | $7,325 | Not Implemented |
UD1025 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,963 | $26,366 | Not Implemented |
UD1025 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $11,875 | $4,845 | Not Implemented |
UD1025 # 10 Y:2020 | 10 | 2020 | INSTALL EQUIPMENT TO MOVE PRODUCT | $454,408 | $375,000 | Not Implemented |
UD1025 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,747 | $0 | Not Implemented |
WV0464 # 10 Y:2013 | 10 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $791 | $1,320 | Not Implemented |
WV0464 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $323 | $500 | Implemented |
WV0464 # 09 Y:2013 | 09 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $935 | $3,500 | Not Implemented |
WV0464 # 07 Y:2013 | 07 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,256 | $1,068 | Implemented |
WV0464 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,550 | $32 | Implemented |
WV0464 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $4,654 | $984 | Implemented |
WV0464 # 08 Y:2013 | 08 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $987 | $2,640 | Not Implemented |
WV0464 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,702 | $0 | Implemented |
WV0464 # 02 Y:2013 | 02 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $17,893 | $1,000 | Not Implemented |
WV0464 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,493 | $17,640 | Implemented |
WV0464 # 01 Y:2013 | 01 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,155 | $6,768 | Not Implemented |
WV0314 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,404 | $5,877 | Not Implemented |
WV0314 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,829 | $605 | Implemented |
WV0314 # 04 Y:2005 | 04 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,156 | $9,591 | Not Implemented |
WV0314 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $217 | $215 | Not Implemented |