IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

439

matching recommendations
Reset
NAICS 322220 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0498 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,036 $11,640 Not Implemented
WI0498 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,268 $0 Not Implemented
WI0498 # 07 Y:2005 07 2005 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,638 $7,500 Not Implemented
WI0498 # 08 Y:2005 08 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,161 $0 Not Implemented
WI0498 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $640 Not Implemented
WI0498 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $509 $600 Not Implemented
WI0494 # 01 Y:2005 01 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,360 $11,500 Not Implemented
WI0494 # 02 Y:2005 02 2005 DISTILL CONTAMINATED SOLVENTS FOR REUSE $12,456 $16,500 Not Implemented
WI0494 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,231 $12,960 Implemented
WI0494 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,060 $6,060 Not Implemented
WI0494 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,037 $1,000 Not Implemented
WI0494 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $207 $640 Not Implemented
WV0314 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,732 $3,713 Implemented
WV0314 # 02 Y:2005 02 2005 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,277 $70 Implemented
WV0314 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,828 $0 Implemented
WV0314 # 04 Y:2005 04 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,156 $9,591 Not Implemented
WV0314 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,404 $5,877 Not Implemented
WV0314 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $605 Implemented
WV0314 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,552 $404 Implemented
WV0314 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $105 Implemented
WV0314 # 09 Y:2005 09 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $461 $138 Not Implemented
WV0314 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $426 $358 Not Implemented
WV0314 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $406 $96 Implemented
WV0314 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $215 Not Implemented
WV0314 # 13 Y:2005 13 2005 $44,003 $60,000 Not Implemented