IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 322220 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,051 $340 Implemented
UD1025 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,411 $4,000 Not Implemented
UD1025 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $83,809 $25,133 Not Implemented
UD1025 # 05 Y:2020 05 2020 REDUCE EXCESSIVE BOILER BLOWDOWN $6,710 $5,224 Not Implemented
UD1025 # 06 Y:2020 06 2020 COMBINE UTILITY METERS $8,278 $0 Not Implemented
UD1025 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $3,612 $7,325 Not Implemented
UD1025 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,963 $26,366 Not Implemented
UD1025 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $11,875 $4,845 Not Implemented
UD1025 # 10 Y:2020 10 2020 INSTALL EQUIPMENT TO MOVE PRODUCT $454,408 $375,000 Not Implemented
UD1025 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,747 $0 Not Implemented
WV0464 # 10 Y:2013 10 2013 INSTALL TIMERS AND/OR THERMOSTATS $791 $1,320 Not Implemented
WV0464 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $323 $500 Implemented
WV0464 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $935 $3,500 Not Implemented
WV0464 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,256 $1,068 Implemented
WV0464 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,550 $32 Implemented
WV0464 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,654 $984 Implemented
WV0464 # 08 Y:2013 08 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $987 $2,640 Not Implemented
WV0464 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,702 $0 Implemented
WV0464 # 02 Y:2013 02 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $17,893 $1,000 Not Implemented
WV0464 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,493 $17,640 Implemented
WV0464 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,155 $6,768 Not Implemented
WV0314 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,404 $5,877 Not Implemented
WV0314 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $605 Implemented
WV0314 # 04 Y:2005 04 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,156 $9,591 Not Implemented
WV0314 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $215 Not Implemented