IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 322220 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0680 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $490 $230 Implemented
CO0680 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,370 $31,720 Not Implemented
CO0680 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,930 $1,310 Implemented
BD0432 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $9,498 $14,512 Not Implemented
BD0432 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $20 Not Implemented
BD0432 # 06 Y:2013 06 2013 SHUT OFF PILOTS IN STANDBY EQUIPMENT $212 $40 Not Implemented
BD0432 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $793 $2,777 Not Implemented
BD0432 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,312 $500 Not Implemented
BD0432 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,832 $4,800 Not Implemented
BD0432 # 02 Y:2013 02 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $6,185 $16,000 Not Implemented
TT0105 # 07 Y:2013 07 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,670 $500 Not Implemented
TT0105 # 06 Y:2013 06 2013 COMBINE UTILITY METERS $25,405 $5,000 Not Implemented
TT0105 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $1,364 Not Implemented
TT0105 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,521 $31,163 Not Implemented
TT0105 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,416 $10,000 Not Implemented
TT0105 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,000 $50,000 Not Implemented
TT0105 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,590 $1,500 Implemented
OK0858 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,791 $1,220 Not Implemented
OK0858 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,717 $66,757 Not Implemented
OK0858 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,454 $63,252 Not Implemented
OK0858 # 05 Y:2013 05 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,018 $268,800 Not Implemented
OK0858 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,338 Implemented
OK0858 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,082 $19,800 Not Implemented
OK0858 # 02 Y:2013 02 2013 INSTALL SET-BACK TIMERS $1,493 $172 Not Implemented
OK0858 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $40,042 $20,360 Not Implemented