IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 322230 Stationery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0290 # 11 Y:2010 11 2010 REDUCE VENTILATION AIR $7,633 $10,197 Implemented
SU0290 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $186 $268 Implemented
SU0290 # 14 Y:2010 14 2010 OPTIMIZE PLANT POWER FACTOR $1,087 $6,486 Implemented
AM0544 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,350 $2,500 Implemented
AM0544 # 07 Y:2008 07 2008 REUSE RAGS UNTIL COMPLETELY SOILED $1,040 $0 Implemented
AM0544 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,200 $42,370 Implemented
AM0544 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $16,810 $0 Implemented
AM0544 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,200 $24,000 Implemented
AM0544 # 05 Y:2008 05 2008 PAY UTILITY BILLS ON TIME $6,800 $0 Implemented
AM0544 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $1,885 $0 Implemented
AM0544 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $0 Implemented
OK0721 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $415 Implemented
OK0721 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,586 $31,632 Implemented
OK0721 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $13,148 Implemented
LE0219 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $129 $100 Implemented
LE0219 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $80 Implemented
LE0219 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $100 Implemented
LE0213 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $22,533 $6,000 Implemented
LE0213 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,825 $1,344 Implemented
LE0213 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,792 $1,000 Implemented
LE0213 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,384 $200 Implemented
LE0213 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,694 $2,000 Implemented
LE0213 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,210 $53,880 Implemented
OK0707 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,571 $25,675 Implemented
OK0707 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,639 $6,750 Implemented