IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0442 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $1,800 Implemented
LE0442 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,186 $5,500 Implemented
LE0442 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,887 $7,663 Implemented
LE0442 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,716 $1,000 Implemented
LE0425 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,005 $35 Implemented
LE0425 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $3,225 Implemented
LE0425 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,485 $1,000 Implemented
LE0425 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,026 $370 Implemented
LE0424 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,065 $3,420 Implemented
LE0424 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $7,795 $2,750 Implemented
LE0424 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,378 $600 Implemented
LE0424 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,742 $1,000 Implemented
WV0483 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,562 $3,000 Implemented
WV0483 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,155 $29,853 Implemented
WV0483 # 02 Y:2014 02 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $21,019 $1,000 Implemented
WV0483 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,169 $0 Implemented
WV0483 # 08 Y:2014 08 2014 DEVELOP A REPAIR/REPLACE POLICY $4,319 $667 Implemented
WV0483 # 14 Y:2014 14 2014 REPAIR OR REPLACE STEAM TRAPS $841 $2,878 Implemented
WV0483 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,819 $155 Implemented
WV0483 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $3,548 $792 Implemented
WV0483 # 09 Y:2014 09 2014 UPGRADE CONTROLS ON COMPRESSORS $4,039 $8,000 Implemented
WV0483 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,328 $1,700 Implemented
WV0479 # 11 Y:2013 11 2013 REPAIR OR REPLACE STEAM TRAPS $4,104 $6,095 Implemented
WV0479 # 14 Y:2013 14 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $559 $50 Implemented
WV0479 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,444 $1,100 Implemented