IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0069 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $0 Not Implemented
MZ0069 # 07 Y:2011 07 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $36,400 $0 Implemented
MZ0069 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $630 $250 Implemented
MZ0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $2,600 Implemented
MZ0069 # 10 Y:2011 10 2011 CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS $65,000 $85,000 Not Implemented
MZ0069 # 11 Y:2011 11 2011 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $120,000 $150,000 Not Implemented
MZ0069 # 12 Y:2011 12 2011 USE PLASTIC PALLETS INSTEAD OF WOOD $25,000 $5,000 Not Implemented
MZ0069 # 13 Y:2011 13 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $35,000 $8,500 Not Implemented
MZ0069 # 14 Y:2011 14 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $115,000 $12,500 Not Implemented
MZ0069 # 15 Y:2011 15 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $115,000 $125,000 Implemented
MZ0050 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,053 $1,160 Not Implemented
MZ0050 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,616 $0 Implemented
MZ0050 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $24,897 $5,000 Implemented
MZ0050 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $6,000 Implemented
MZ0050 # 05 Y:2010 05 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $916 $1,000 Not Implemented
MZ0050 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,280 $0 Not Implemented
MZ0050 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $311 $1,250 Not Implemented
MZ0050 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $15,507 $0 Implemented
MZ0039 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,883 $510,446 Implemented
MZ0039 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,294 $8,400 Implemented
MZ0039 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0039 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,863 $0 Implemented
MZ0039 # 05 Y:2009 05 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $15,679 $18,600 Implemented
BD0313 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $180,015 $152 Implemented
BD0313 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,962 $5,000 Implemented