IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0479 # 14 Y:2013 14 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $559 $50 Implemented
LE0320 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,024 $2,093 Not Implemented
LE0320 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,159 $1,360 Implemented
LE0320 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,200 $5,076 Not Implemented
LE0320 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $356 $180 Implemented
LE0320 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $9,057 $19,312 Implemented
LE0320 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $6,336 $12,169 Not Implemented
LE0299 # 01 Y:2010 01 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $29,292 $375,000 Not Implemented
LE0299 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,307 $18,000 Not Implemented
LE0299 # 03 Y:2010 03 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,520 $66,360 Not Implemented
LE0299 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,599 $3,000 Implemented
LE0299 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,849 $800 Implemented
LE0299 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,703 $800 Implemented
LE0299 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $697 $150 Implemented
LE0299 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $13,847 Implemented
WV0392 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,773 $18,784 Implemented
WV0392 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,132 $1,667 Implemented
WV0392 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,526 $6,750 Not Implemented
WV0392 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,525 $2,660 Not Implemented
WV0392 # 05 Y:2009 05 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,417 $1,000 Implemented
WV0392 # 06 Y:2009 06 2009 DEVELOP A REPAIR/REPLACE POLICY $3,444 $681 Implemented
WV0392 # 07 Y:2009 07 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,252 $392 Implemented
WV0392 # 08 Y:2009 08 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,814 $5,000 Not Implemented
WV0392 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,192 $0 Implemented
WV0392 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $660 Not Implemented