Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,649
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0502 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,900 | $1,000 | Implemented |
AM0502 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $3,340 | $340 | Implemented |
AM0502 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,200 | $2,730 | Implemented |
AM0502 # 12 Y:2006 | 12 | 2006 | USE SYNTHETIC LUBRICANT | $800 | $0 | Not Implemented |
AM0502 # 13 Y:2006 | 13 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $510 | Implemented |
AM0502 # 14 Y:2006 | 14 | 2006 | USE PHOTOCELL CONTROLS | $200 | $0 | Implemented |
WI0505 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $105,600 | $2,700 | Implemented |
WI0505 # 02 Y:2006 | 02 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $38,400 | $1,000 | Not Implemented |
WI0505 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,774 | $6,289 | Implemented |
WI0505 # 04 Y:2006 | 04 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,380 | $3,200 | Not Implemented |
WI0505 # 05 Y:2006 | 05 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,205 | $7,840 | Implemented |
WI0505 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,153 | $0 | Implemented |
LM0107 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,522 | $2,400 | Not Implemented |
LM0107 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,219 | $2,200 | Implemented |
LM0107 # 03 Y:2006 | 03 | 2006 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $225,208 | $12,980 | Implemented |
LM0107 # 04 Y:2006 | 04 | 2006 | DEVELOP STANDARD OPERATING PROCEDURES | $178,334 | $5,400 | Implemented |
LM0107 # 05 Y:2006 | 05 | 2006 | ADOPT IN-HOUSE MATERIAL GENERATION | $16,864 | $1,000 | Implemented |
LM0107 # 06 Y:2006 | 06 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $20,251 | $1,000 | Implemented |
UU0092 # 01 Y:2005 | 01 | 2005 | USE SOY OR WATER-BASED INKS | $28,070 | $20,000 | Not Implemented |
UU0092 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,250 | $19,000 | Not Implemented |
UU0092 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,083 | $3,270 | Not Implemented |
UU0092 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $1,130 | $1,800 | Not Implemented |
UU0092 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $740 | $280 | Not Implemented |
AM0498 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,000 | $5,250 | Not Implemented |
AM0498 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,898 | $0 | Not Implemented |