IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,649

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0322 # 05 Y:2005 05 2005 USE RADIANT HEATER FOR SPOT HEATING $6,482 $1,500 Not Implemented
WV0322 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,038 $15,738 Implemented
WV0322 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $0 Implemented
WV0322 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $525 Implemented
WV0322 # 09 Y:2005 09 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,045 $160 Not Implemented
WV0322 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,114 $330 Not Implemented
WV0322 # 11 Y:2005 11 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $687 $250 Implemented
WV0322 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $664 $248 Implemented
OK0708 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,172 $6,087 Implemented
OK0708 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $6,700 Implemented
OK0708 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $1,327 Implemented
OK0708 # 04 Y:2005 04 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Not Implemented
OK0708 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $37,832 $13,050 Implemented
OK0708 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,450 $26,280 Implemented
OK0708 # 07 Y:2005 07 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,070 $700 Implemented
UD0717 # 01 Y:2005 01 2005 INCREASE USE OF AUTOMATION $68,000 $145,000 Implemented
UD0717 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,398 $0 Not Implemented
UD0717 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,783 $39,200 Implemented
UD0717 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $12,702 $5,400 Implemented
UD0717 # 05 Y:2005 05 2005 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $12,000 $2,300 Not Implemented
UD0717 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,225 $0 Implemented
UD0717 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,553 $11,448 Implemented
UD0717 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,395 $0 Not Implemented
UD0717 # 09 Y:2005 09 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,658 $2,526 Implemented
UD0717 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,845 $0 Not Implemented