IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0307 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $176,493 $288,000 n/a
TT0307 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,477 $3,890 n/a
TT0307 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $5,884 $240 n/a
TT0307 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,676 $225 n/a
TT0307 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $1,450 n/a
TT0307 # 06 Y:2024 06 2024 USE SOLAR HEAT FOR HEAT $27,962 $102,465 n/a
TT0222 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $857 $440 Implemented
TT0222 # 03 Y:2019 03 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,547 $2,050 Not Implemented
TT0222 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,993 $16,370 Implemented
TT0222 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $7,958 $4,620 Not Implemented
TT0117 # 01 Y:2013 01 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $8,640 $0 Implemented
TT0117 # 02 Y:2013 02 2013 DISCONNECT BALLASTS $517 $0 Not Implemented
TT0117 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,012 $90 Implemented
TT0117 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $22,871 $6,600 Implemented
TT0117 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $233 Implemented
TT0117 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $5,770 $7,200 Implemented
TT0117 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $3,376 $7,150 Implemented
TT0076 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,311 $0 Implemented
TT0076 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,661 $5,000 Implemented
TT0076 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $1,654 Not Implemented
TT0076 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,371 $4,540 Not Implemented
TT0076 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,101 $13,238 Not Implemented
TT0019 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,183 $115,288 Not Implemented
TT0019 # 04 Y:2008 04 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,835 $1,200 Implemented
TT0019 # 02 Y:2008 02 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $7,295 $10,000 Not Implemented