Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
885
matching recommendationsNAICS | 324 | Petroleum and Coal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0272 # 03 Y:2025 | 03 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,800 | $16,300 | n/a |
UU0272 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $11,200 | n/a |
UU0272 # 10 Y:2025 | 10 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,500 | $600 | n/a |
UU0272 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $31,500 | $18,800 | n/a |
UU0272 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,600 | $207,000 | n/a |
UU0272 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $410 | n/a |
UU0272 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $62,900 | $32,400 | n/a |
UU0272 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,170 | $26,600 | n/a |
UU0272 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $23,600 | n/a |
UU0272 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $54,700 | $110,000 | n/a |
UU0272 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $66,000 | $13,000 | n/a |
WV0677 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $290 | $446 | n/a |
WV0677 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,244 | $540 | n/a |
WV0677 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $15,762 | $7,782 | n/a |
WV0677 # 03 Y:2025 | 03 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $10,271 | $5,515 | n/a |
WV0677 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,107 | $5,200 | n/a |
WV0677 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,687 | $1,418 | n/a |
WV0677 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,491 | $60,024 | n/a |
WV0677 # 07 Y:2025 | 07 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $2,517 | $12,170 | n/a |
WV0677 # 06 Y:2025 | 06 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $3,254 | $14,320 | n/a |
DL0254 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $943 | $0 | n/a |
DL0254 # 03 Y:2025 | 03 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,746 | $7,000 | n/a |
DL0254 # 08 Y:2025 | 08 | 2025 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $88,915 | $400,000 | n/a |
DL0254 # 07 Y:2025 | 07 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,855 | $58,000 | n/a |
DL0254 # 06 Y:2025 | 06 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,559 | $7,500 | n/a |