IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1045 # 10 Y:2022 10 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,319 $15,000 Not Implemented
UD1045 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,617 $32,900 Not Implemented
UD1045 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $2,200 Not Implemented
UD1045 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,938 $35,826 Not Implemented
UD1045 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $720 $1,000 Not Implemented
UD1045 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,284 $453 Not Implemented
UD1045 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,605 $600 Not Implemented
UD1045 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,090 $27,500 Not Implemented
UD1045 # 02 Y:2022 02 2022 COMBINE UTILITY METERS $1,103 $0 Not Implemented
UD1045 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,883 $0 Not Implemented
UD0897 # 07 Y:2014 07 2014 ADD AREA LIGHTING SWITCHES $664 $600 Not Implemented
UD0897 # 09 Y:2014 09 2014 USE RADIANT HEATER FOR SPOT HEATING $22,517 $48,000 Not Implemented
UD0897 # 08 Y:2014 08 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $142 $900 Not Implemented
UD0897 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,409 $5,020 Not Implemented
UD0897 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $765 $0 Implemented
UD0897 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,897 $5,000 Not Implemented
UD0897 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $755 $1,000 Implemented
UD0897 # 02 Y:2014 02 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $405 $0 Not Implemented
UD0897 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,780 $0 Not Implemented
UD0709 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,133 $0 Not Implemented
UD0709 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,708 $3,213 Not Implemented
UD0709 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $3,977 $4,500 Implemented
UD0709 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,529 $0 Implemented
UD0709 # 03 Y:2005 03 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,847 $40,000 Not Implemented
UD0709 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,549 $34,600 Not Implemented