Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 324 | Petroleum and Coal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0416 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $625 | $200 | Not Implemented |
UM0416 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $222 | $450 | Implemented |
SD0453 # 01 Y:2012 | 01 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,250 | $200 | Implemented |
SD0453 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,500 | $200 | Implemented |
SD0453 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,950 | $200 | Implemented |
SD0453 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,913 | $2,000 | Implemented |
SD0453 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $49,200 | $24,400 | Implemented |
SD0453 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,400 | $25,600 | Not Implemented |
SD0453 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,700 | $12,150 | Implemented |
UD0849 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,274 | $2,000 | Not Implemented |
UD0849 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,241 | $11,000 | Not Implemented |
UD0849 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $34,045 | $44,000 | Not Implemented |
UD0849 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,530 | $1,000 | Not Implemented |
UD0849 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,199 | $500 | Not Implemented |
UD0849 # 03 Y:2012 | 03 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,632 | $0 | Not Implemented |
UD0849 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,445 | $0 | Not Implemented |
UD0849 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,282 | $15,816 | Not Implemented |
UMS001 # 04 Y:2012 | 04 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $13,000 | $15,000 | Not Implemented |
UMS001 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $938,000 | $1,000,000 | Not Implemented |
UMS001 # 02 Y:2012 | 02 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $782,000 | $1,377,000 | Not Implemented |
UMS001 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $986,100 | $900,000 | Not Implemented |