IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

833

matching recommendations
Reset
NAICS 3241 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0423 # 15 Y:2009 15 2009 General $8,403 $1,164 Not Implemented
UF0423 # 16 Y:2009 16 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,288 $506 Not Implemented
UF0423 # 17 Y:2009 17 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $68,520 $24,901 Not Implemented
AM0553 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $80,000 $960 Implemented
AM0553 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,080 $1,500 Implemented
AM0553 # 03 Y:2008 03 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $19,260 $80,000 Not Implemented
AM0553 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $19,840 $30,650 Implemented
AM0553 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,380 $0 Implemented
AM0553 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,970 $500 Implemented
AM0553 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $630 $800 Not Implemented
AM0553 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $325 Implemented
UM0339 # 01 Y:2008 01 2008 USE OPTIMUM TEMPERATURE $136,461 $172,800 Not Implemented
UM0339 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $108,562 $15,000 Not Implemented
UM0339 # 03 Y:2008 03 2008 BURN WASTE OIL FOR HEAT $42,258 $4,000 Not Implemented
UM0339 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,917 $2,600 Not Implemented
UM0339 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,086 $2,540 Not Implemented
UM0339 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $3,808 $682 Not Implemented
UM0339 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,808 $4,620 Not Implemented
BD0338 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $1,103 Not Implemented
BD0338 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,705 $751 Not Implemented
BD0338 # 03 Y:2007 03 2007 DISCONNECT BALLASTS $2,472 $241 Not Implemented
BD0338 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $509 $2 Not Implemented
BD0338 # 05 Y:2007 05 2007 USE SYNTHETIC LUBRICANT $1,378 $2 Not Implemented
BD0338 # 06 Y:2007 06 2007 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $369,530 $30,001 Not Implemented
BD0338 # 07 Y:2007 07 2007 REPLACE BOILER $36,792 $110,001 Implemented