Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
72
matching recommendationsNAICS | 3241 | Petroleum and Coal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0630 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,264 | $14,760 | n/a |
UF0630 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $40,000 | n/a |
UF0630 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $958 | $0 | n/a |
UF0630 # 02 Y:2025 | 02 | 2025 | KEEP SOLID FUELS / RAW MATERIALS DRY | $25,034 | $48,000 | n/a |
UF0630 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $625 | $1,750 | n/a |
UF0630 # 12 Y:2025 | 12 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,323 | $0 | n/a |
UF0630 # 11 Y:2025 | 11 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $11,572 | $20,000 | n/a |
UF0630 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,256 | $2,120 | n/a |
UF0630 # 01 Y:2025 | 01 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $66,329 | $8,820 | n/a |
UF0630 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,407 | $25,400 | n/a |
UF0630 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $2,000 | n/a |
UF0630 # 03 Y:2025 | 03 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,224 | $8,907 | n/a |
UU0272 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $11,200 | n/a |
UU0272 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $66,000 | $13,000 | n/a |
UU0272 # 10 Y:2025 | 10 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,500 | $600 | n/a |
UU0272 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,600 | $207,000 | n/a |
UU0272 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $410 | n/a |
UU0272 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $62,900 | $32,400 | n/a |
UU0272 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,170 | $26,600 | n/a |
UU0272 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $23,600 | n/a |
UU0272 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $54,700 | $110,000 | n/a |
UU0272 # 03 Y:2025 | 03 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,800 | $16,300 | n/a |
UU0272 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $31,500 | $18,800 | n/a |
WV0677 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,491 | $60,024 | n/a |
WV0677 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $15,762 | $7,782 | n/a |