IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

232

matching recommendations
Reset
NAICS 324121 Asphalt Paving Mixture and Block Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2214 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $226 $25 Not Implemented
LS2214 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $53,187 $50,000 Implemented
LS2214 # 01 Y:2022 01 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $137 $0 Implemented
LS2214 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,189 $270 Implemented
LS2214 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $217 $38 Implemented
LS2214 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,374 $1,394 Not Implemented
LS2214 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63 $150 Not Implemented
AS0488 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,944 $27,312 Not Implemented
AS0488 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $118,609 $10,790 Implemented
AS0488 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,602 $272 Implemented
AS0488 # 04 Y:2020 04 2020 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,344 $36 Implemented
AS0488 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,864 $7,653 Implemented
AS0488 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,828 $3,940 Not Implemented
AS0488 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $395 $1,840 Not Implemented
OR0731 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $550 $419 Not Implemented
OR0731 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,777 $55 Not Implemented
OR0731 # 01 Y:2020 01 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,247 $579,059 Not Implemented
OR0731 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,289 $1,924 Not Implemented
CL1912 # 04 Y:2019 04 2019 PAY UTILITY BILLS ON TIME $103 $0 Implemented
CL1912 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $1,166 $1,750 Implemented
CL1912 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $4,162 Implemented
SF0545 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $238,757 $1,300,334 Implemented
SF0545 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $1,151 $1,194 Implemented
SF0545 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $2,276 Not Implemented
SF0545 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,924 $11,386 Implemented